Triple
Connected Vehicle Roadside Equipment to Vehicle OBE: work zone information
Flow Description
Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.
|
Solutions
![]() ![]() ![]() ![]() ![]() ![]() ![]() Solution Description
This solution is used within the U.S.. It combines standards associated with US: SAE J3067 (J2735 SE) with those for V-X: Local Unicast Wireless (US). The US: SAE J3067 (J2735 SE) standards include a proposed solution for the upper-layers to implement V2X information flows that do not yet have fully standardized messages, functionality or performance charcateristics. The V-X: Local Unicast Wireless (US) standards include lower-layer standards that support local-area unicast wireless solutions, such as DSRC technologies, LTE, etc.
|
Triple Solution Gap
|
ITS Info
![]() SAE J3067
![]() |
Click gap icons for more info.
|
||
Mgmt
IEEE 1609.3
![]() IEEE 1609.4 ![]() |
Facility
SAE J2945/0
![]() |
Security
![]() IEEE 1609.2
![]() |
|
TransNet
IEEE 1609.3
![]() |
|||
SubNet
|