Triple
Connected Vehicle Roadside Equipment to ITS Roadway Equipment: signal priority service request
Flow Description
A service request for vehicle priority issued to a traffic signal controller that results in green extension or other accommodation for the priority vehicle, within the current signal timing plan. The request includes the priority level, the desired time and duration of service, and the intended travel path through the intersection. This flow also allows the RSE to cancel a previously issued request for priority.
|
Solutions
Solution Description
This solution is used within the European Union. It combines standards associated with (None-Data) with those for I-F: EU-ICIP-C2F. The (None-Data) standards include an unspecified set of standards at the upper layers. The I-F: EU-ICIP-C2F standards include lower-layer placeholder for a European solution currently under development. It is planned that the EU-ICIP will provide guidance as to what lower-layer standards should be used in various environments, but it is not expected to directly specify these layers.
|
Triple Solution Gap
|
ITS Info
Development needed
|
Click gap icons for more info.
|
||
Mgmt
Development needed
|
Facility
Development needed
Development needed |
Security
Development needed
|
|
TransNet
|
|||
SubNet
|